what is lead time for a ISO certified LCD?

Post Reply
proto
Posts: 26
Joined: Tue Feb 20, 2018 11:07 pm

what is lead time for a ISO certified LCD?

Post by proto »

What is the lead time for a LCD that is ISO9001:2015 certified?
LCD_Designs
Posts: 262
Joined: Thu Feb 22, 2018 9:49 pm

Re: what is lead time for a ISO certified LCD?

Post by LCD_Designs »

ISO does not really slow down the design and production of LCDs for new designs.

As a general rule the lead times for each type of LCD technology is as follows.

Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
LCD_Designs
Posts: 262
Joined: Thu Feb 22, 2018 9:49 pm

Re: what is lead time for a ISO certified LCD?

Post by LCD_Designs »

ISO does not really slow down the design and production of LCDs for new designs.

As a general rule the lead times for each type of LCD technology is as follows.

Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
Post Reply