Re: what is lead time for a ISO certified LCD?
ISO does not really slow down the design and production of LCDs for new designs.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
-
- Posts: 262
- Joined: Thu Feb 22, 2018 9:49 pm
Re: what is lead time for a ISO certified LCD?
ISO does not really slow down the design and production of LCDs for new designs.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.