what is lead time for a ISO certified LCD?
Posted: Mon Apr 16, 2018 9:05 pm
by proto
What is the lead time for a LCD that is ISO9001:2015 certified?
Re: what is lead time for a ISO certified LCD?
Posted: Mon Apr 23, 2018 4:44 pm
by LCD_Designs
ISO does not really slow down the design and production of LCDs for new designs.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.
Re: what is lead time for a ISO certified LCD?
Posted: Mon Apr 23, 2018 4:44 pm
by LCD_Designs
ISO does not really slow down the design and production of LCDs for new designs.
As a general rule the lead times for each type of LCD technology is as follows.
Character = 6 - 8 weeks
Segment = 8 to 10 weeks
TFT = 8 to 160 week
OLED = This lead time is all over the place. anywhere from 8 weeks to 20 weeks.